YMN ENGINEERING INDUSTRY TRADE LTD. STI.

Comprehensive Construction Services

We develop innovative, sustainable solutions to respond to our customers' most complex problems.

Projects

AKAVI MILK POWDER FACTORY, BOILER DEPARTMENT AND ADMINISTRATIVE BUILDING CONSTRUCTION

Our project, the construction of which was completed in Manisa, Salihli District OIZ, consists of a Factory, Boiler Office and Administrative Building in an area of 4500 m2.

The project, whose construction was started in 2022, is in progress.

AKAVI MILK POWDER FACTORY, BOILER DEPARTMENT AND ADMINISTRATIVE BUILDING CONSTRUCTION

Our project, the construction of which was completed in Manisa, Salihli District OIZ, consists of a Factory, Boiler Office and Administrative Building in an area of 4500 m2.

The project, whose construction was started in 2022, is in progress.

MESPAN COOLING SYSTEMS FACTORY AND ADMINISTRATIVE BUILDING CONSTRUCTION

Manisa Province Salihli District OSB construction  our project, which we started the construction of, consists of a Factory and Administrative Building with a total construction area of 4700m2. It will be manufactured as Prefabricated Reinforced Concrete. Its construction started in 2022 and the factory part has been completed, and the finishing works of the administrative building are continuing.

MENEMEN WAREHOUSE CONSTRUCTION

It is a completely reinforced concrete structure consisting of 3 blocks and the administrative building on a total of 16.500 m2 closed area, which we started the construction of in the Menemen district of İzmir. Curtain heights are 9.50 m. It is made with an industrial formwork system. Its construction was started in October 2022 and the 1st Stage warehouse building is about to be completed.

EVEREST ARGE ENGINEERING FACTORY AND ADMINISTRATIVE BUILDING CONSTRUCTION

Manisa Province Salihli District OSB construction  our project consists of a Factory and Administrative Building with a total construction area of 3.600 m2. Its construction started in June 2022 and its finishing works are continuing.

WASTE WATER TREATMENT PLANT

Manisa province Salihli District OSB construction  our project, which we started with a total construction area of 1.200 m2, consists of Ventilation, Balancing, Sedimentation and Facility Building june_1994_bad5cf58_cc781994_bad5cf58_cc781994_bad5cf583 It was started in May and was completed at the end of the year.

IT AGRO WAREHOUSE CONSTRUCTION

Izmit province Körfez İlçesinde construction and consultancy service cc7819_df583355b_cc5819_f3355bdbc-3194-bb3b-136bad5cf58d_cc5819_1365359bbb3b-1365355bbb3b-136bad5cf3153bb3b_c5819_33559bbbbc5819_1365359 It consists of the Production, Warehouse and Administrative Building with a total construction area of 500 m2 . Its construction started in 2021 year and was completed in 2022 February _cc781905-5cdeb-316594-bb3

IT AGRO WAREHOUSE CONSTRUCTION

Izmit province Körfez İlçesinde construction and consultancy service cc7819_df583355b_cc5819_f3355bdbc-3194-bb3b-136bad5cf58d_cc5819_1365359bbb3b-1365355bbb3b-136bad5cf3153bb3b_c5819_33559bbbbc5819_1365359 It consists of the Production, Warehouse and Administrative Building with a total construction area of 500 m2 . Its construction started in 2021 year and was completed in 2022 February _cc781905-5cdeb-316594-bb3

TURBO FIN HEAT EXCHANGER CONSTRUCTION

The construction of the factory and administrative building, the construction of which was started in Salihli OSB, has a total closed area of 9,800 m2. Its construction began in 2022.